Balance D.M. Water Plant of NPCIL KAPP-3&4 unit

NUVIA India bagged the significant work for ‘Balance Supply, Fabrication, Erection, Testing, Commissioning and trail run of Filtration and D.M. Water Plant of KAPP-3&4’

Project parties

Client: Kakrapar Atomic Power Project-3 & 4 – Nuclear Power Corporation of India Limited

Awarding authority: Nuclear Power Corporation of India Limited

General contractor: NUVIA India Pvt Ltd

Project challenges
  • Since more than 70% of the work was completed by the previous contractor, finding the installation error is a very difficult task.
  • There has to be multiple trials before we can reach the desired level of purity from this demineralised water plant.
Scope

This job includes Completion of balance works of Filtration and D.M. Water Plant of KAPP- 3&4 like Supply of Pipes, fittings, valves, hardware, steel, cement, control & Instrumentation items, chemicals, Media, Resins, etc., handling, transportation of free issue materials, Fabrication, Erection, Welding and testing of CS/SS/CPVC/PVC Piping.

Location

Country: India

Site: Kakrapar Gujarat Site

Unit: KAPPS 3&4

Building: D.M. Water Plant

Key figures

  • Project Value: 1.38 Million €

  • Project Completion Date: 9 Months from award of contract