Operation

Start date: February 2024

End date: August 2024

Implementation of access means (scaffolding) and containment for the scheduled Five-Year Shutdown (refurbishment).

Key details

  • Client: VARO Energy

  • General Contractor: NUVIA FRANCE

  • Country: Switzerland

Technical Scope

  • Contract Type: Lump-sum based on a negotiated schedule of rates

Project Stakes

  • High demand for responsiveness and co-activity management
  • Significant peak volumes (equipment, assembly personnel)
  • Continuous adaptation of structures according to trade requirements
  • Unit-rate schedule covering different types of structures
0 –1220 tons
NUMBER OF STRUCTURES ASSEMBLED
0 m3
SCAFFOLDING VOLUME
0
on average, 75 at peak APPROXIMATE NUMBER OF PEOPLE DURING ASSEMBLY
0 % less than
REWORK RATE (ESTIMATED)