Dismantling

Installation of access systems (scaffolding) and containment measures (rail-mounted side tarpaulins + two thermo-welded plastic films) for asbestos removal and dismantling works.

Key details

  • Client: GME VEOLIA/NEOM for NAVAL GROUP

  • General Contractor: NUVIA FRANCE

  • Country: France

Technical Scope

  • Combination of tarpaulins (facades and overhead ‘umbrella’) and shrink-wrapped tarpaulin (interior).
  • Awarded the contract despite strong competition, including from a local on-site competitor.
  • Schedule adherence achieved. Client satisfaction from the very first unit.

Challenges

  • Access equipment for working at height, scaffolding, walkways.
  • Triple-layer, depressurized containment.
  • Safety measures for high-altitude work areas.