Operational nuclear site

Design and implementation of a temporary access structure on the Flamanville 1 and Flamanville 2 reactors.

Key details

  • Client: Bouygues Nuclear Construction Services for EDF Flamanville 1 & 2

  • General Contractor: NUVIA FRANCE

  • Country: France

Technical Scope

  • Controlled Area on a scaffolding base for reinforcement of intrados and extrados
  • Contract Type: Lump-sum

Project Stakes

  • First installation of this type in a Nuclear Power Plant (Modular building + Access platform, access to the hopper via elevator)
  • Multiple trades and skill sets involved
  • 4 different containment techniques / Triple containment
  • Special cladding connection pieces (patented)
  • 3D dynamic study of the structure
0 to 120
NUMBER OF PERSONNEL DURING ASSEMBLY
0 m3/year
SCAFFOLDING VOLUME
0 /year
NUMBER OF STRUCTURES ASSEMBLED