{"id":30599,"date":"2026-01-26T10:07:14","date_gmt":"2026-01-26T09:07:14","guid":{"rendered":"https:\/\/www.nuvia.com\/?p=30599"},"modified":"2026-02-02T10:26:23","modified_gmt":"2026-02-02T09:26:23","slug":"demontaz-fessenheim-nuvia-se-podili-na-vyznamne-jaderne-transformaci","status":"publish","type":"post","link":"https:\/\/www.nuvia.com\/cs\/demontaz-fessenheim-nuvia-se-podili-na-vyznamne-jaderne-transformaci\/","title":{"rendered":"Demont\u00e1\u017e Fessenheim: NUVIA se pod\u00edl\u00ed na v\u00fdznamn\u00e9 jadern\u00e9 transformaci"},"content":{"rendered":"
Ve Fessenheimu (Francie) se NUVIA pod\u00edl\u00ed na demont\u00e1\u017ei symbolick\u00e9ho m\u00edsta.
Otev\u00edr\u00e1me novou kapitolu s v\u00fdznamn\u00fdm projektem: demont\u00e1\u017e\u00ed jadern\u00e9 elektr\u00e1rny Fessenheim, emblematu francouzsk\u00e9ho jadern\u00e9ho parku.<\/p>\n
Na\u0161e ambice jsou jasn\u00e9: dokon\u010dit demont\u00e1\u017e alespo\u0148 jednoho ze dvou reaktor\u016f b\u011bhem 15 let \u2013 bezprecedentn\u00ed \u010dasov\u00fd r\u00e1mec, v\u00fdrazn\u011b krat\u0161\u00ed ne\u017e u srovnateln\u00fdch za\u0159\u00edzen\u00ed.<\/p>\n
Abychom tuto v\u00fdzvu zvl\u00e1dli, na\u0161e t\u00fdmy mobilizuj\u00ed cel\u00e9 spektrum odbornost\u00ed: in\u017een\u00fdrstv\u00ed, logistiku, v\u00fdstavbu, bezpe\u010dnost, radia\u010dn\u00ed ochranu a koordinaci na m\u00edst\u011b.<\/p>\n
Prvn\u00ed pr\u00e1ce zahrnuj\u00ed t\u00e9m\u011b\u0159 \u00faplnou demont\u00e1\u017e velk\u00e9 technick\u00e9 m\u00edstnosti (40 m \u00d7 10 m) obsahuj\u00edc\u00ed rozs\u00e1hl\u00e9 potrubn\u00ed syst\u00e9my, ocelov\u00e9 konstrukce a za\u0159\u00edzen\u00ed. Tak\u00e9 provedeme vz\u00e1cnou a technicky n\u00e1ro\u010dnou operaci: odstran\u011bn\u00ed t\u0159\u00ed velk\u00fdch n\u00e1dr\u017e\u00ed (ka\u017ed\u00e1 o pr\u016fm\u011bru 7 m a v\u00fd\u0161ce 11 m). Tato operace bude provedena pomoc\u00ed zvedac\u00edho syst\u00e9mu kombinovan\u00e9ho s postupn\u00fdm \u0159ez\u00e1n\u00edm \u2013 slo\u017eit\u00e1 metoda vy\u017eaduj\u00edc\u00ed maxim\u00e1ln\u00ed p\u0159esnost a plnou technickou kontrolu.<\/p>\n
Ve\u0161ker\u00e9 pr\u00e1ce mus\u00ed b\u00fdt prov\u00e1d\u011bny v prost\u0159ed\u00ed s paraleln\u00edmi aktivitami, p\u0159\u00edtomnost\u00ed citliv\u00fdch materi\u00e1l\u016f (azbest, olovo) a \u00fazkou koordinac\u00ed s EDF a ostatn\u00edmi dodavateli, co\u017e vy\u017eaduje absolutn\u00ed d\u016fslednost.<\/p>\n
To je teprve za\u010d\u00e1tek. Posilujeme na\u0161i p\u0159\u00edtomnost na m\u00edst\u011b, abychom podpo\u0159ili tento rozs\u00e1hl\u00fd projekt a p\u0159ipravili se na dal\u0161\u00ed f\u00e1ze demont\u00e1\u017en\u00edho procesu.<\/p>\n<\/div>